Scheduling Work at Two Customer Sites? Confirm Each Site With a Six-Field Checklist

Separate job-wide information from site access and work conditions, then use six fields to confirm each task and check the effect of schedule changes.

JunProjects

Suppose a customer needs equipment inspections at two sites. A salesperson receives “Wednesday works” in LINE, and the coordinator marks both rows in Excel as confirmed. When the team starts assigning people, they discover that the customer only confirmed Site A. The staff at Site B have not yet agreed that the team can enter. A reply about one site was treated as clearance to work at both.

If this happens often, start with a site-by-site scheduling sheet. Separate the information shared across the job from the details each site needs to confirm. Run through the process in your existing spreadsheet to see which information is worth capturing in the first phase of a system.

Separate the job, the site and the work

One job may have an overall contact, an agreed quotation scope and a project owner. Each site can still have different local contact arrangements, access windows and work. Decide what the main contact can confirm for the whole job and what requires a reply from a local contact. If the main contact can confirm both sites, ask them to say explicitly which sites their reply covers.

One site can also have several tasks, such as a survey followed by installation. A single “confirmed” status for the whole job makes those differences hard to see. Use the job identifier, a site code and the specific task to identify each row so whoever receives a reply can find the right entry. If someone corrects the wording of an address, check whether it is still the same site and record why it changed. A text correction does not require a second entry.

Make each scheduling row answer six questions

Start with two or three tasks that span different sites. Keep private phone numbers and access details out of sheets shared externally. Share only the parts the recipient needs to confirm.

  1. Where is the work, and what does it cover? Record the site code, the task and what is excluded. Share the address only with people who need it.
  2. Who can confirm it? List the person or role responsible for confirming each site, the internal coordinator and any backup contact. If one person replies on behalf of several sites, identify the sites covered.
  3. What condition is still outstanding? For example, confirm when the team can enter, whether equipment can be taken out of operation, and who must prepare the site. Record who will check each condition.
  4. Is the date ready to book? Distinguish a suggested slot, a provisional hold and a confirmed slot. A provisional hold is not a customer commitment.
  5. Which row does this confirmation apply to? Record the source, date, site and conditions covered. For a verbal reply, the coordinator records what both sides confirmed.
  6. Who needs to know if something changes? Record the effect of a reschedule, cancellation or site change. If the sites share people or equipment, check whether the other row also needs to move.

The sheet does not need to reproduce every chat message. Keep enough information for the next person to determine which row can be scheduled and why, then assign someone to maintain it.

Hypothetical example: Site A can proceed, but Site B is waiting

This hypothetical example does not describe a real customer, product feature or result. An equipment service team is scheduling inspections at two sites. The main contact says Wednesday works. The coordinator checks and learns that this reply only covers Site A. Its access window and local arrangements are confirmed. At Site B, the equipment downtime is still unknown, so that row stays pending with the role responsible for replying.

If the work and resources are independent, the coordinator can schedule Site A under company rules without marking the entire job as unable to start. If one technician was supposed to visit both sites on the same day, first check whether Site A can be handled on its own and whether travel or staffing would change. The person responsible for scheduling reviews that decision.

Next, try a reschedule. Site B proposes a different time, so the coordinator updates only its row and checks any shared resources. If Site A must move as well, record why and tell the person who previously confirmed it. Updating one job-level date should not erase that original record.

Use two examples to decide the first phase

Try one example in which a site is confirmed and another is pending, then one in which a change at one site might affect the other. Ask someone who was not in the original chat to schedule from the sheet. Can they identify the confirmed row, what is missing and whom to ask? Can they find the original confirmation and the reason for a change?

If the sheet already addresses the main problem, standardize the records and responsibilities first. Assess automatic notifications, resource scheduling and external integrations separately against your actual needs.

See JunProjects custom management systems for an approach to roles, statuses and handovers. To discuss your process, start a proposal and describe how confirmation differs between two sites. A de-identified example is enough to start. AI PM helps clarify requirements and prepare preliminary estimates. Our team reviews and confirms formal scope, pricing, delivery dates, acceptance and maintenance arrangements.