Maintenance or a New Feature? Check the Agreed Baseline with an Issue Report
Start with expected behaviour, observed results and business impact before classifying post-launch requests. Includes a hypothetical maintenance workflow, three client questions and six information groups for the handling team.
“Could you change this?” can mean different kinds of work
After a system goes live, clients often leave messages such as “the list is wrong” or “could it send a reminder as well?” Treating everything as a new feature can overlook an existing fault. Treating everything as maintenance can quietly absorb a new workflow into the engagement.
Before cooperation begins, agree how incoming issues will be investigated and routed, as well as which maintenance activities are included. Establishing shared facts first gives both sides a better basis for discussing responsibility, cost and scheduling than immediately debating whether something is covered by warranty.
Describe the symptom without asking the client to classify it
Clients do not need technical terminology or a complete specification. An initial report can answer just three questions:
- What were you trying to do?
- What did you expect to see, and what actually happened?
- Which work is affected, and is a workable alternative available?
“I selected Close, saw a successful save message, but the list still says In Progress” is easier to check than “the status looks strange.” If the issue cannot currently be reproduced, retain its timing and operational clues rather than concluding that there is no problem.
The person handling the report can gradually add the version, environment, reproduction steps and record comparisons. Screenshots and examples should contain only what the discussion needs, with personal and confidential information removed. Keep credentials out of ordinary report forms.
Record business impact separately from the type of work
Impact answers how urgently the situation needs attention: whether essential work has stopped, which roles are affected and whether there is a workaround. Work type answers what sort of action may be needed. Do not combine these into one field.
Atlassian’s incident management guidance focuses on responding to unplanned events or service interruptions and restoring operation. Its service request guidance places everyday requests within a trackable intake process. This article borrows the routing perspective; those categories do not determine whether work in a particular engagement is chargeable. Incident management / Service request management
A practical initial classification is:
- Possible deviation from agreed delivery: the result differs from the agreed operation or acceptance criteria; check the version and facts first.
- Operational or configuration assistance: the steps, existing settings or data conditions need clarification.
- Environment or external-service change: for example, an external interface has changed; assess its impact and the scope of responsibility.
- New or changed rules: additional roles, conditions, automatic actions or delivery outcomes require a separate assessment.
These are provisional investigation categories, not conclusions about liability. Mark an unexplained cause as unconfirmed. A fix appearing simple does not establish that it is either free or chargeable.
Hypothetical example: separate a closing issue from automatic future scheduling
The following is a hypothetical example, not an actual client issue or a statement that JunProjects provides these features.
An equipment team’s maintenance system has an agreed scope: staff record the result and explicitly close the task. A user reports: “After completion, the list still says In Progress. Could it automatically schedule the next maintenance task and send a reminder too?”
The person handling the report first separates the two issues. For the list status, check whether the agreed steps were completed and whether the saved record matches the screen. If the user closed the task but the result still differs from the agreement, record a reproducible scenario for investigation. If the user saved without completing the closing step, explain the current workflow while noting any confusing interaction.
Scheduling the next task and sending reminders introduce new date rules, recipients and exception handling. Record these as a separate item for assessment. Do not let the new idea replace the original issue report, or describe an unevaluated reminder feature as accepted.
Handle the original issue according to the verified cause. Arrange the additional work only after confirming scope, acceptance, price and scheduling. The two records may reference each other, but each needs its own status and completion basis.
Six information groups for the person handling the report
These fields are for the team to organise, rather than a form the client must complete in full:
- Agreed baseline: the requirement or acceptance version and the originally agreed outcome.
- Observed behaviour: expected versus actual results, conditions and checkable clues.
- Business impact: affected work, roles and available alternatives.
- Provisional classification: its basis, open questions and responsible contact.
- Current arrangement: investigation, guidance, a temporary measure or a separate estimate, including who must confirm what first.
- Completion evidence: the scenario to repeat, who will confirm it and the version accepted afterwards.
If a record already exists for the same issue, update it rather than creating another queue entry because the wording changed. If investigation overturns the original classification, retain the reason for that correction so the next contact can follow the evidence.
Agree the handling stages before cooperation begins
“Includes maintenance” does not define the intake channel, service hours, included activities, external charges or cooperation responsibilities. Ask the team to distinguish receipt, initial assessment, a proposed handling arrangement and verification after correction. Response and restoration conditions need agreement; receiving a message is not a promise of a completion time.
For a temporary measure, record who agreed it, its limits and the next check. Restoring the ability to work does not establish that the cause has been removed. An initial estimate for an added feature is also distinct from formal approval.
JunProjects’ AI PM helps clarify requirements and prepare preliminary estimates. The human team reviews and confirms formal scope, price, delivery schedule and maintenance arrangements. Explore custom management system planning, or use the proposal form to describe the work you want to improve. If the features are still undecided, start with one report example that contains no confidential information.