Back to articles

Practical insights

How to Write Acceptance Criteria Both Clients and Engineers Can Repeat

Turn “the feature works” into a repeatable acceptance scenario with context, action and observable outcomes. Includes a hypothetical equipment request, a required-field check and four review statuses.

JunProjects

Why “the feature works” is still hard to accept

“Users can submit a request,” “managers can search,” and “the screen is easy to use” sound like requirements. At acceptance, they can still mean different things. What should appear after submission? Which record should a manager find? If information is missing, should the request be rejected or saved?

For businesses coordinating work through Excel and LINE, a scenario both sides can repeat is often more useful than a longer feature list. Acceptance criteria help the client judge whether the work is complete and tell engineers which outcome to implement.

Write a scenario card with context, action and outcome

Cucumber’s official specification examples describe an initial context, an action and an expected outcome, emphasizing observable output. We are borrowing this way of expressing a scenario; clients do not need to write code or adopt a particular tool. Source: Cucumber Gherkin Reference

Start each card with three questions:

  1. Context: Who is using the system, what state is it in, and which test data is ready?
  2. Action: What single action does the user take?
  3. Outcome: What must appear, and on which screen or document, for the result to meet the requirement?

Add the requirement reference, applicable version, acceptance reviewer and evidence location. Keep each card focused on one rule so a failure can be traced. Avoid combining form entry, approval, email and reporting into one statement that “the workflow works.”

Hypothetical example: make an equipment request verifiable

This is a hypothetical example of how to write criteria. It is not a client case, and it does not mean the JunProjects website provides equipment-borrowing functionality.

Suppose a company’s proposed first release lets employees submit borrowing requests. An administrator then arranges the equipment manually. The parties begin with this draft:

  • Scenario reference: BOR-01, linked to the “submit a borrowing request” requirement and a version awaiting confirmation.
  • Context: Use a test employee account. Equipment name, borrowing date and purpose have been entered. The request has not been submitted.
  • Action: Select “Submit request” once.
  • Expected outcome: The request detail shows a request reference, the entered information and a “Pending arrangement” status. Reopening that record shows the same information.
  • Evidence and review: Record the test environment, executed version, request reference, execution date, actual result and acceptance reviewer.

This card confirms receipt of the request. “Pending arrangement” does not mean the equipment has been reserved. Stock availability, notifications or automatic scheduling need separate confirmation of whether they belong in this release.

Describe when the same rule must prevent success

Passing the normal scenario can leave decisions unresolved. If the borrowing date is required, write a separate BOR-02:

The equipment name and purpose are filled in, but the date is blank. The user selects “Submit request.” The expected outcome is an understandable message beside the date field, preservation of the other entered values, and no new request being created. Agree how to check this, such as reviewing the request list with the same test account.

These are drafts for discussion, not universal answers for every system. Whether a draft can be saved and which information may be changed depend on the actual workflow. When the client cannot yet decide, mark the item “To be confirmed” and name the decision-maker. Do not hide an assumption inside the criteria.

Replace subjective descriptions with a way to check

“Easy,” “fast” and “accurate” express useful expectations, but they are not sufficient pass conditions. Ask:

  • Easy to use: Which role follows which steps to complete which part of the work?
  • Accurate data: Which fields must match which agreed set of test data?
  • Fast search: What environment and test-data volume apply? Which action starts timing, what measurement method is used, and what threshold have both parties agreed?

Do not insert an attractive response-time target before checking the environment and data volume. For layout preferences, compare against an agreed design version. Record visual review separately from workflow outcomes so “the screen looks wrong” does not leave the whole acceptance item undecidable.

Record the actual result before choosing the next step

For each execution, retain the expected and actual outcomes rather than just a tick. Four statuses can help:

  1. Passed: Meets the confirmed criteria, with the necessary evidence.
  2. Failed: Identifies the differing outcome, repeatable steps and test-data reference.
  3. Blocked: An account, test data or prerequisite feature is unavailable; record the blocker and its owner.
  4. Awaiting decision: The criteria have two interpretations; a person with authority must resolve them.

After a failed item is corrected, rerun the same scenario. Compare newly requested work against the original requirement and version before classifying it as a correction, clarification or additional assessment. Use test data for evidence and restrict access. Do not put real client information or credentials into shared screenshots.

Bring one outcome to your proposal

You could start with: “We currently receive equipment requests through LINE. After submission, I want to check what was received and distinguish requests that have not been arranged.” A complete specification is not needed at the start. Context, action and outcome can be clarified progressively.

JunProjects’ AI PM can help organize requirements and draft acceptance criteria. AI estimates support discussion; the human team reviews and confirms the formal scope, fees and schedule. Explore custom software planning, or start a proposal by describing one piece of work. The first step is a shared, verifiable understanding of “complete.”